11.05.2016
THE “COMPOSIT” WELDED FLOAT HOSE IN A SAND QUARRY
The Tyumen Region sand quarry has recently acquired a Composit DU-530 floating pipe, with a welded float, for sand and gravel extraction. The section is 200 m long. The Composit pipelines installed over five years ago have proved their worth, and the company again chose Composit products when it decided to extend the section.
20.11.2024
07.11.2024